模板Forms are laid out upon the slab to outline the walls and features, such as windows, of the panels.
ALIGNMENT &MEASUREMENT
Once the casting surface, also known as floor slab or pad, has cured, tilt-up panels can be created. Panels are measured and outlined in preparation for the formwork.
ERECTING & BRACING [TILT-UP]Panels are raised by a crane, moved into position, set on the foundation, and adjusted into final placement with shims. Once a panel is in place, temporary braces are set to support the panel until the roof is attached.
DRILLING FORANCHOR
Rotary hammer is used to drill a hole for the anchor that will secure the brace.
RECOMMENDED PRODUCTS:ROTARY HAMMERS
ANCHORFASTENING
Impact Wrench is used to fasten the panel brace to the floor.
Vacuums and dust extractors can be used to remove slurry created during polishing, cutting, or grinding.
RECOMMENDED PRODUCTS:真空吸尘器
REMOVINGIMPERFECTIONSAND OVERPOURS
During the pouring process, concrete may cure in an imperfect manner if a form dislodges. Those imperfections are then removed first with demolition or rotary hammers.